Product Features
Slurry Property and Slurry Filming Experimental Platform
The platform is equipped with a sound hole pressure monitoring system and two independent slurry pressure loading systems (pneumatic pressure system and hydraulic automatic pressure system), which can tests on slurry film formation, slurry film splitting and slurry film air tightness under different slurry pressure and geological conditions, and it can achieve slurry pressure loading of up to 1.0mpa.
① Permeation test
② Slurry split test
③ Property test
CRTG International
Avic Tower,
East Third Ring Road B 10,
Chaoyang District, Beijing City, P. R. China
Email: info@crtg.cn
CRTG
No.2 (Self-Made), West Side of Gongye 4th Road,
Mingzhuwanqibu Area,
Nansha District,
Guangzhou City, Guangdong Province, P. R. China
Tunnelling to Link the World
-
ꁸ Top
-
ꂅ 88888888
-
ꀥ QR code